![]() | ![]() |
2008 | ||
---|---|---|
5 | EE | Ik Sun Lee, C. S. Sung: Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research 186(3): 931-952 (2008) |
2002 | ||
4 | EE | C. S. Sung, Y. I. Choung, J. M. Hong, Y. H. Kim: Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals. Computers & OR 29(8): 995-1007 (2002) |
1994 | ||
3 | EE | C. S. Sung, B. K. Yoo: Parametric max flow problems in a class of networks with series-parallel structure. Computers & OR 21(7): 769-776 (1994) |
1988 | ||
2 | EE | C. S. Sung, Jai-Hyun Byun: Technical note on a parallel-facilities production planning model with capacity constraints. Computers & OR 15(6): 585-587 (1988) |
1987 | ||
1 | EE | C. S. Sung, J. T. Rhee: A dynamic production scheduling model with lost-sales or backlogging. Computers & OR 14(2): 163-171 (1987) |
1 | Jai-Hyun Byun | [2] |
2 | Y. I. Choung | [4] |
3 | J. M. Hong | [4] |
4 | Y. H. Kim | [4] |
5 | Ik Sun Lee | [5] |
6 | J. T. Rhee | [1] |
7 | B. K. Yoo | [3] |