2008 | ||
---|---|---|
2 | EE | Imed Kacem, Chengbin Chu, Ahmed Souissi: Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times. Computers & OR 35(3): 827-844 (2008) |
2004 | ||
1 | EE | Ahmed Souissi, Imed Kacem, Chengbin Chu: Minimizing total tardiness on a single machine with sequence-dependent setup times. SMC (2) 2004: 1481-1485 |
1 | Chengbin Chu | [1] [2] |
2 | Imed Kacem | [1] [2] |