2007 | ||
---|---|---|
7 | EE | Pawel Dabrowski, Jaroslaw Pempera, Czeslaw Smutnicki: Minimizing Cycle Time of the Flow Line - Genetic Approach with Gene Expression. ICANNGA (1) 2007: 194-201 |
2006 | ||
6 | EE | Eugeniusz Nowicki, Czeslaw Smutnicki: Some aspects of scatter search in the flow-shop problem. European Journal of Operational Research 169(2): 654-666 (2006) |
2005 | ||
5 | EE | Czeslaw Smutnicki, Adam Tynski: Job-Shop Scheduling by GA. A New Crossover Operator. OR 2005: 715-720 |
4 | EE | Eugeniusz Nowicki, Czeslaw Smutnicki: An Advanced Tabu Search Algorithm for the Job Shop Problem. J. Scheduling 8(2): 145-159 (2005) |
2004 | ||
3 | EE | Eugeniusz Nowicki, Czeslaw Smutnicki: 2D and 3D Representations of Solution Spaces for CO Problems. International Conference on Computational Science 2004: 483-490 |
1994 | ||
2 | EE | Eugeniusz Nowicki, Czeslaw Smutnicki: An Approximation Algorithm for a Single-Machine Scheduling Problem with Release Times and Delivery Times. Discrete Applied Mathematics 48(1): 69-79 (1994) |
1993 | ||
1 | EE | Eugeniusz Nowicki, Czeslaw Smutnicki: New Results in the Worst-Case Analysis for Flow-Shop Scheduling. Discrete Applied Mathematics 46(1): 21-41 (1993) |
1 | Pawel Dabrowski | [7] |
2 | Eugeniusz Nowicki | [1] [2] [3] [4] [6] |
3 | Jaroslaw Pempera | [7] |
4 | Adam Tynski | [5] |