2009 |
5 | EE | Mark Eklin,
Yohanan Arzi,
Avraham Shtub:
Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation.
European Journal of Operational Research 194(1): 294-306 (2009) |
2007 |
4 | EE | Izack Cohen,
Boaz Golany,
Avraham Shtub:
Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology.
J. Scheduling 10(3): 181-193 (2007) |
3 | EE | Izack Cohen,
Boaz Golany,
Avraham Shtub:
The stochastic time-cost tradeoff problem: A robust optimization approach.
Networks 49(2): 175-188 (2007) |
2006 |
2 | EE | Harel Eilat,
Boaz Golany,
Avraham Shtub:
Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology.
European Journal of Operational Research 172(3): 1018-1039 (2006) |
2005 |
1 | EE | Izack Cohen,
Boaz Golany,
Avraham Shtub:
Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology.
Annals OR 134(1): 183-199 (2005) |