![]() |
| 2007 | ||
|---|---|---|
| 2 | EE | Hui Peng, Wenli Shang, Haibo Shi, Wei Peng: On-Line Monitoring and Diagnosis of Failures Using Control Charts and Fault Tree Analysis (FTA) Based on Digital Production Model. KSEM 2007: 544-549 |
| 2004 | ||
| 1 | Wenli Shang, Yushun Fan: Integrated Optimization Model of Production Planning and Scheduling for Batch Production. ICEB 2004: 419-421 | |
| 1 | Yushun Fan | [1] |
| 2 | Hui Peng | [2] |
| 3 | Wei Peng | [2] |
| 4 | Haibo Shi | [2] |