![]() |
| 2005 | ||
|---|---|---|
| 3 | EE | Norbert Trautmann, Christoph Schwindt: A Heuristic Method for Large-Scale Batch Scheduling in the Process Industries. OR 2005: 155-160 |
| 2 | EE | Klaus Neumann, Christoph Schwindt, Norbert Trautmann: Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European Journal of Operational Research 165(2): 495-509 (2005) |
| 2003 | ||
| 1 | EE | Klaus Neumann, Christoph Schwindt, J. Zimmermann: Order-based neighborhoods for project scheduling with nonregular objective functions. European Journal of Operational Research 149(2): 325-343 (2003) |
| 1 | Klaus Neumann | [1] [2] |
| 2 | Norbert Trautmann | [2] [3] |
| 3 | J. Zimmermann | [1] |