| 2004 |
| 5 | EE | Anna M. Lassila,
Sameh M. Saad,
Terrence D. Perera,
Tomasz Koch,
Jaroslaw Chrobot:
Modelling and Simulation of Human-Centred Assembly Systems - A Real Case Study.
BASYS 2004: 405-412 |
| 4 | EE | Jean Khalil,
Sameh M. Saad,
Nabil N. Z. Gindy,
Ken MacKechnie:
A Maintenance Policy Selection Tool for Industrial Machine Parts.
BASYS 2004: 431-440 |
| 3 | EE | S. C. L. Koh,
Sameh M. Saad,
J. Padmore:
Development and implementation of a generic order release scheme for modelling MRP-controlled finite-capacitated manufacturing environments.
Int. J. Computer Integrated Manufacturing 17(6): 561-576 (2004) |
| 2003 |
| 2 | EE | Sameh M. Saad,
Terrence D. Perera,
Ruwan Wickramarachchi:
Distributed simulation in manufacturing: simulation of distributed manufacturing enterprises: a new approach.
Winter Simulation Conference 2003: 1167-1173 |
| 2002 |
| 1 | EE | Sameh M. Saad,
Adil Baykasoglu,
Nabil N. Z. Gindy:
A new integrated system for loading and scheduling in cellular manufacturing.
Int. J. Computer Integrated Manufacturing 15(1): 37-49 (2002) |