![]() |
| 2006 | ||
|---|---|---|
| 4 | EE | Linn I. Sennott, Mark P. Van Oyen, Seyed M. R. Iravani: Optimal dynamic assignment of a flexible worker on an open production line with specialists. European Journal of Operational Research 170(2): 541-566 (2006) |
| 1999 | ||
| 3 | EE | Mark P. Van Oyen: Stochastic sequencing with job families, set-up times, and due dates. Int. J. Systems Science 30(2): 175-181 (1999) |
| 1998 | ||
| 2 | EE | Eungab Kim, Mark P. Van Oyen: Dynamic scheduling to minimize lost sales subject to set-up costs. Queueing Syst. 29(2-4): 193-229 (1998) |
| 1995 | ||
| 1 | EE | Izak Duenyas, Mark P. Van Oyen: Stochastic scheduling of parallel queues with set-up costs. Queueing Syst. 19(4): 421-444 (1995) |
| 1 | Izak Duenyas | [1] |
| 2 | Seyed M. R. Iravani | [4] |
| 3 | Eungab Kim | [2] |
| 4 | Linn I. Sennott | [4] |