2008 |
7 | | Li Li,
Nilufer Onder:
Generating Plans in Concurrent, Probabilistic, Over-Subscribed Domains.
AAAI 2008: 957-962 |
6 | EE | Matt Watkins,
Amlan Mukherjee,
Nilufer Onder:
Using situational simulations to collect and analyze dynamic construction management decision-making data.
Winter Simulation Conference 2008: 2377-2386 |
2007 |
5 | EE | G. Ryan Anderson,
Nilufer Onder,
Amlan Mukherjee:
Expecting the unexpected: representing, reasoning about, and assessing construction project contingencies.
Winter Simulation Conference 2007: 2041-2050 |
2006 |
4 | | Janae N. Foss,
Nilufer Onder:
A Hill-Climbing Approach for Planning with Temporal Uncertainty.
FLAIRS Conference 2006: 868- |
3 | EE | Nilufer Onder,
G. C. Whelan,
Li Li:
Engineering a Conformant Probabilistic Planner.
J. Artif. Intell. Res. (JAIR) 25: 1-15 (2006) |
1999 |
2 | | Nilufer Onder,
Martha E. Pollack:
Conditional, Probabilistic Planning: A Unifying Algorithm and Effective Search Control Mechanisms.
AAAI/IAAI 1999: 577-584 |
1997 |
1 | | Nilufer Onder,
Martha E. Pollack:
Contingency Selection in Plan Generation.
ECP 1997: 364-376 |