2003 | ||
---|---|---|
4 | T. Murayama: Statistical-mechanical approach to the distributed source coding. ICIP (1) 2003: 589-592 | |
1996 | ||
3 | F. Oba, T. Murayama, D. Ma: Integrated production management for production planning, loading and scheduling. APMS 1996: 363-374 | |
1994 | ||
2 | T. Murayama, F. Hattori: Adaptive Architecture for Flexible Information Systems. IFIP Congress (1) 1994: 157-162 | |
1992 | ||
1 | T. Murayama, F. Oba: Design Aid Based on Concurrent Processing of Design Tasks. PROLAMAT 1992: 503-513 |
1 | F. Hattori | [2] |
2 | D. Ma | [3] |
3 | F. Oba | [1] [3] |