2007 | ||
---|---|---|
2 | EE | Jinjiang Yuan, Yundong Mu, Lingfa Lu, Wenhua Li: Rescheduling with Release dates to minimize Total Sequence Disruption under a Limit on the makespan. APJOR 24(6): 789-796 (2007) |
1 | EE | Jinjiang Yuan, Yundong Mu: Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption. European Journal of Operational Research 182(2): 936-944 (2007) |
1 | Wenhua Li | [2] |
2 | Lingfa Lu | [2] |
3 | Jinjiang Yuan | [1] [2] |