![]() | ![]() |
2006 | ||
---|---|---|
2 | EE | Ibrahim A. Motawa, Chimay J. Anumba, Ashraf El-Hamalawi: A fuzzy system for evaluating the risk of change in construction projects. Advances in Engineering Software 37(9): 583-591 (2006) |
2004 | ||
1 | Ibrahim A. Motawa, Andrew D. F. Price, Willy Sher: Modelling the implementation of technological innovations in construction. IJCAT 20(1-3): 78-89 (2004) |
1 | Chimay J. Anumba | [2] |
2 | Ashraf El-Hamalawi | [2] |
3 | Andrew D. F. Price | [1] |
4 | Willy Sher | [1] |