![]() | ![]() |
2003 | ||
---|---|---|
5 | EE | R. P. Mohanty: Towards knowledge management: a case study. IJITM 2(3): 197-213 (2003) |
4 | EE | A. S. Babu, S. A. George, R. P. Mohanty: Manufacturing performance measurement systems: a review. IJMTM 5(5/6): 398-413 (2003) |
3 | EE | A. Rathore, R. P. Mohanty, A. C. Lyons: Managing total productivity: a practical application of measurement and optimisation. IJMTM 5(5/6): 459-471 (2003) |
2 | EE | P. Poornachandra Rao, R. P. Mohanty: Impact of cellular manufacturing on supply chain management: exploration of interrelationships between design issues. IJMTM 5(5/6): 507-520 (2003) |
2001 | ||
1 | EE | M. K. Tiwari, M. Chandrasekaran, R. P. Mohanty: Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation. Int. J. Computer Integrated Manufacturing 14(4): 399-408 (2001) |
1 | A. S. Babu | [4] |
2 | M. Chandrasekaran | [1] |
3 | S. A. George | [4] |
4 | A. C. Lyons | [3] |
5 | P. Poornachandra Rao | [2] |
6 | A. Rathore | [3] |
7 | Manoj Kumar Tiwari (M. K. Tiwari) | [1] |