![]() | ![]() |
2002 | ||
---|---|---|
2 | EE | Abdulrezak Mohamed, Tahir Celik: Knowledge based-system for alternative design, cost estimating and scheduling. Knowl.-Based Syst. 15(3): 177-188 (2002) |
2001 | ||
1 | EE | Abdulrezak Mohamed: Knowledge based approach for productivity adjusted construction schedule. Expert Syst. Appl. 21(2): 87-97 (2001) |
1 | Tahir Celik | [2] |