![]() |
| 2003 | ||
|---|---|---|
| 5 | EE | Olugbenga Mejabi: Framework for a lean manufacturing planning system. IJMTM 5(5/6): 563-578 (2003) |
| 2000 | ||
| 4 | EE | Yousif Mustafa, Olugbenga Mejabi: Changing class behaviors at run-time in MRP systems. Journal of Systems and Software 55(1): 67-71 (2000) |
| 1999 | ||
| 3 | EE | Yousif Mustafa, Olugbenga Mejabi: An Approach for Developing Flexible MRP Systems. IS Management 16(2): 58-63 (1999) |
| 1997 | ||
| 2 | EE | Zuohong Pan, Xiaodi Liu, Olugbenga Mejabi: A Neural-Fuzzy System for Forecasting. HICSS (5) 1997: 549- |
| 1993 | ||
| 1 | EE | Olugbenga Mejabi: Object-oriented simulation using model builder. Winter Simulation Conference 1993: 303-307 |
| 1 | Xiaodi Liu | [2] |
| 2 | Yousif Mustafa | [3] [4] |
| 3 | Zuohong Pan | [2] |