2008 | ||
---|---|---|
2 | EE | M. Rong, N. K. Mahapatra, M. Maiti: A two warehouse inventory model for a deteriorating item with partially/fully backlogged shortage and fuzzy lead time. European Journal of Operational Research 189(1): 59-75 (2008) |
2006 | ||
1 | EE | N. K. Mahapatra, M. Maiti: Production-inventory Model for a deteriorating Item with Imprecise Preparation Time for Production in a Finite Time Horizon. APJOR 23(2): 171-192 (2006) |
1 | M. Maiti | [1] [2] |
2 | M. Rong | [2] |