![]() | ![]() |
2007 | ||
---|---|---|
4 | EE | Xiaochuan Luo, Chengbin Chu: A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness. European Journal of Operational Research 180(1): 68-81 (2007) |
2006 | ||
3 | EE | Xiaochuan Luo, Feng Chu: A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness. Applied Mathematics and Computation 183(1): 575-588 (2006) |
2005 | ||
2 | EE | Xiao Liu, Chengen Wang, Xiaochuan Luo, Dingwei Wang: A Model and Algorithm for Out-Sourcing Planning. ICEBE 2005: 195-199 |
2001 | ||
1 | EE | Deqiang Gan, Xiaochuan Luo, Donald V. Bourcier, Robert J. Thomas: Min-Max Power Transfer Capability: A New Concept. HICSS 2001 |
1 | Donald V. Bourcier | [1] |
2 | Chengbin Chu | [4] |
3 | Feng Chu | [3] |
4 | Deqiang Gan | [1] |
5 | Xiao Liu | [2] |
6 | Robert J. Thomas | [1] |
7 | Chengen Wang | [2] |
8 | Dingwei Wang | [2] |