2002 | ||
---|---|---|
2 | EE | Wang Lixin, Loo Hay Lee: Scheduling and dispatching: a simulation study on release, synchronization, and dispatching in MEMS fabrication. Winter Simulation Conference 2002: 1392-1400 |
2000 | ||
1 | EE | Wang Lixin, Francis Eng Hock Tay, Loo Hay Lee: Scheduling MEMS manufacturing. Winter Simulation Conference 2000: 1472-1480 |
1 | Loo Hay Lee | [1] [2] |
2 | Francis Eng Hock Tay | [1] |