2008 | ||
---|---|---|
5 | EE | Tae-Eog Lee: A review of scheduling theory and methods for semiconductor manufacturing cluster tools. Winter Simulation Conference 2008: 2127-2135 |
4 | EE | Sang-Jin Lee, Tae-Eog Lee: Scheduling a multi-chip package assembly line with reentrant processes and unrelated parallel machines. Winter Simulation Conference 2008: 2286-2291 |
2004 | ||
3 | EE | Jin-Hwan Lee, Tae-Eog Lee, Jeong-Hyeon Park: Cluster tool module communication based on a high-level fieldbus. Int. J. Computer Integrated Manufacturing 17(2): 151-170 (2004) |
2003 | ||
2 | Ja-Hee Kim, Tae-Eog Lee: Schedule stabilization and robust timing control for time-constrained cluster tools. ICRA 2003: 1039-1044 | |
2002 | ||
1 | EE | Jin-Kyu Lee, Tae-Eog Lee: Automata-based supervisory control logic design for a multi-robot assembly cell. Int. J. Computer Integrated Manufacturing 15(4): 319-334 (2002) |
1 | Ja-Hee Kim | [2] |
2 | Jin-Hwan Lee | [3] |
3 | Jin-Kyu Lee | [1] |
4 | Sang-Jin Lee | [4] |
5 | Jeong-Hyeon Park | [3] |