2008 | ||
---|---|---|
8 | EE | Dorota Kuchta: Optimization with Fuzzy Present Worth Analysis and Applications. Fuzzy Engineering Economics with Applications 2008: 43-69 |
7 | EE | Dorota Kuchta: Fuzzy Rate of Return Analysis and Applications. Fuzzy Engineering Economics with Applications 2008: 97-104 |
2007 | ||
6 | EE | Barbara Gladysz, Dorota Kuchta: Outliers Detection in Selected Fuzzy Regression Models. WILF 2007: 211-218 |
2003 | ||
5 | EE | Dorota Kuchta: User-tailored fuzzy relations between intervals. EUSFLAT Conf. 2003: 437-441 |
4 | EE | Barbara Gladysz, Dorota Kuchta: Minimisation of the expected weighted number of jobs being late with fuzzy processing time in a one machine system. EUSFLAT Conf. 2003: 582-585 |
3 | EE | Konstantinos P. Triantis, Sudipta Sarangi, Dorota Kuchta: Fuzzy pair-wise dominance and fuzzy indices: An evaluation of productive performance. European Journal of Operational Research 144(2): 412-428 (2003) |
2002 | ||
2 | EE | Dorota Kuchta: A generalisation of an algorithm solving the fuzzy multiple choice knapsack problem. Fuzzy Sets and Systems 127(2): 131-140 (2002) |
2001 | ||
1 | EE | Stefan Chanas, Dorota Kuchta: A new approach to fuzzy goal programming. EUSFLAT Conf. 2001: 199-201 |
1 | Stefan Chanas | [1] |
2 | Barbara Gladysz | [4] [6] |
3 | Sudipta Sarangi | [3] |
4 | Konstantinos P. Triantis | [3] |