2009 |
10 | EE | Andreas T. Ernst,
Horst W. Hamacher,
Houyuan Jiang,
Mohan Krishnamoorthy,
Gerhard J. Woeginger:
Uncapacitated single and multiple allocation p-hub center problems.
Computers & OR 36(7): 2230-2241 (2009) |
2004 |
9 | EE | Houyuan Jiang,
Mohan Krishnamoorthy,
David Sier:
Preface.
Annals OR 127(1-4): 17-20 (2004) |
8 | EE | Andreas T. Ernst,
Houyuan Jiang,
Mohan Krishnamoorthy,
B. Owens,
David Sier:
An Annotated Bibliography of Personnel Scheduling and Rostering.
Annals OR 127(1-4): 21-144 (2004) |
7 | EE | Houyuan Jiang,
Mohan Krishnamoorthy,
David Sier:
Preface.
Annals OR 128(1-4): 17-20 (2004) |
6 | EE | Andreas T. Ernst,
Houyuan Jiang,
Mohan Krishnamoorthy,
David Sier:
Staff scheduling and rostering: A review of applications, methods and models.
European Journal of Operational Research 153(1): 3-27 (2004) |
5 | EE | Natashia Boland,
Mohan Krishnamoorthy,
Andreas T. Ernst,
Jamie Ebery:
Preprocessing and cutting for multiple allocation hub location problems.
European Journal of Operational Research 155(3): 638-653 (2004) |
2003 |
4 | EE | James F. Campbell,
Gary Stiehr,
Andreas T. Ernst,
Mohan Krishnamoorthy:
Solving hub arc location problems on a cluster of workstations.
Parallel Computing 29(5): 555-574 (2003) |
2001 |
3 | EE | Andreas T. Ernst,
Houyuan Jiang,
Mohan Krishnamoorthy,
H. Nott,
David Sier:
An Integrated Optimization Model for Train Crew Management.
Annals OR 108(1-4): 211-224 (2001) |
2 | | Mohan Krishnamoorthy,
Andreas T. Ernst,
Yazid M. Sharaiha:
Comparison of Algorithms for the Degree Constrained Minimum Spanning Tree.
J. Heuristics 7(6): 587-611 (2001) |
1999 |
1 | EE | Andreas T. Ernst,
Mohan Krishnamoorthy,
Robert H. Storer:
Heuristic and exact algorithms for scheduling aircraft landings.
Networks 34(3): 229-241 (1999) |