![]() | ![]() |
2006 | ||
---|---|---|
3 | EE | Amir Azaron, Farhad Kianfar: A multi-objective lead time control problem in multistage assembly systems using an interactive method. Applied Mathematics and Computation 176(2): 609-620 (2006) |
2005 | ||
2 | EE | Farhad Kianfar: A numerical method to approximate optimal production and maintenance plan in a flexible manufacturing system. Applied Mathematics and Computation 170(2): 924-940 (2005) |
2003 | ||
1 | EE | Amir Azaron, Farhad Kianfar: Dynamic shortest path in stochastic dynamic networks: Ship routing problem. European Journal of Operational Research 144(1): 138-156 (2003) |
1 | Amir Azaron | [1] [3] |