![]() |
| 2004 | ||
|---|---|---|
| 3 | EE | Seong-Yong Jang, Doosuk Kim, Roger Kerr: A Study on the Machine Loading Problem Considering Machine-Breakdown in Flexible Manufacturing Systems. AsiaSim 2004: 50-58 |
| 1995 | ||
| 2 | EE | Jürgen Dorn, Roger Kerr, Gabi Thalhammer: Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning. Int. J. Hum.-Comput. Stud. 42(6): 687-704 (1995) |
| 1993 | ||
| 1 | Jürgen Dorn, Roger Kerr, Gabi Thalhammer: Reactive Scheduling in a Fuzzy-Temporal Framework. Knowledge-Based Reactive Scheduling 1993: 39-56 | |
| 1 | Jürgen Dorn | [1] [2] |
| 2 | Seong-Yong Jang | [3] |
| 3 | Doosuk Kim | [3] |
| 4 | Gabi Thalhammer | [1] [2] |