2008 | ||
---|---|---|
2 | EE | Philip Kaminsky, Zu-Hsu Lee: Effective on-line algorithms for reliable due date quotation and large-scale scheduling. J. Scheduling 11(3): 187-204 (2008) |
2001 | ||
1 | EE | Philip Kaminsky, David Simchi-Levi: Asymptotic analysis of an on-line algorithm for the single machine completion time problem with release dates. Oper. Res. Lett. 29(3): 141-148 (2001) |
1 | Zu-Hsu Lee | [2] |
2 | David Simchi-Levi | [1] |