![]() | ![]() |
2007 | ||
---|---|---|
3 | EE | Evangelos K. Christakos, Glikeria Kalfakakou: An economic evaluation model for concession on convention infrastructure projects in Greece. Operational Research 7(1): 147-164 (2007) |
2006 | ||
2 | EE | Evangelos K. Christakos, Glikeria Kalfakakou: The criticality of the time on the refund of the projects. The special case of the concession projects. Operational Research 6(1): 27-36 (2006) |
1 | EE | Georgios N. Aretoulis, Demos C. Angelides, Glikeria Kalfakakou, Georgios S. Fotiadis, Konstantinos I. Anastasiadis: A prototype system for the prediction of final cost in construction projects. Operational Research 6(3): 323-332 (2006) |
1 | Konstantinos I. Anastasiadis | [1] |
2 | Demos C. Angelides | [1] |
3 | Georgios N. Aretoulis | [1] |
4 | Evangelos K. Christakos | [2] [3] |
5 | Georgios S. Fotiadis | [1] |