2008 |
8 | EE | Min Ji,
T. C. Edwin Cheng:
Parallel-machine scheduling with simple linear deterioration to minimize total completion time.
European Journal of Operational Research 188(2): 342-347 (2008) |
7 | EE | Min Ji,
T. C. Edwin Cheng:
An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan.
Inf. Process. Lett. 108(4): 171-174 (2008) |
2007 |
6 | EE | Min Ji,
Yong He,
T. C. Edwin Cheng:
Single-machine scheduling with periodic maintenance to minimize makespan.
Computers & OR 34(6): 1764-1770 (2007) |
5 | EE | Min Ji,
Yong He,
T. C. Edwin Cheng:
A simple linear time algorithm for scheduling with step-improving processing times.
Computers & OR 34(8): 2396-2402 (2007) |
4 | EE | Min Ji,
Yong He,
T. C. Edwin Cheng:
Batch delivery scheduling with batch delivery cost on a single machine.
European Journal of Operational Research 176(2): 745-755 (2007) |
3 | EE | Min Ji,
T. C. Edwin Cheng:
An FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespan.
Inf. Process. Lett. 102(2-3): 41-47 (2007) |
2006 |
2 | EE | T. C. Edwin Cheng,
Yong He,
Han Hoogeveen,
Min Ji,
Gerhard J. Woeginger:
Scheduling with step-improving processing times.
Oper. Res. Lett. 34(1): 37-40 (2006) |
1 | EE | Min Ji,
Yong He,
T. C. Edwin Cheng:
Scheduling linear deteriorating jobs with an availability constraint on a single machine.
Theor. Comput. Sci. 362(1-3): 115-126 (2006) |