2008 |
7 | EE | Y. C. Han,
G. H. Huang,
C. H. Li:
An Interval-Parameter Multi-stage Stochastic Chance-Constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty.
FSKD (5) 2008: 146-153 |
6 | EE | Y. P. Li,
G. H. Huang,
X. H. Nie,
S. L. Nie:
A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems.
European Journal of Operational Research 189(2): 399-420 (2008) |
5 | EE | C. Z. Wu,
X. P. Yan,
G. H. Huang,
Y. P. Li:
An Intelligent Agent Mobile emissions Model for Urban Environmental Management.
International Journal of Software Engineering and Knowledge Engineering 18(4): 485-502 (2008) |
2007 |
4 | EE | Simon Wu,
Jonathan Li,
G. H. Huang:
Modeling the effects of elevation data resolution on the performance of topography-based watershed runoff simulation.
Environmental Modelling and Software 22(9): 1250-1260 (2007) |
3 | EE | Y. P. Li,
G. H. Huang:
Fuzzy two-stage quadratic programming for planning solid waste management under uncertainty.
Int. J. Systems Science 38(3): 219-233 (2007) |
2006 |
2 | EE | X. Y. Wu,
G. H. Huang,
L. Liu,
J. B. Li:
An interval nonlinear program for the planning of waste management systems with economies-of-scale effects - A case study for the region of Hamilton, Ontario, Canada.
European Journal of Operational Research 171(2): 349-372 (2006) |
2005 |
1 | | Q. G. Lin,
G. H. Huang,
B. Bass:
An energy systems modelling approach for the planning of power generation: a North American case study.
IJCAT 22(2-3): 151-159 (2005) |