![]() | ![]() |
2002 | ||
---|---|---|
8 | EE | Luis Gouveia, Leslie A. Hall: Multistars and directed flow formulations. Networks 40(4): 188-201 (2002) |
1998 | ||
7 | Leslie A. Hall: Approximability of flow shop scheduling. Math. Program. 82: 175-190 (1998) | |
1996 | ||
6 | Michel X. Goemans, Leslie A. Hall: The Strongest Facets of the Acyclic Subgraph Polytope Are Unknown. IPCO 1996: 415-429 | |
5 | Leslie A. Hall, David B. Shmoys, Joel Wein: Scheduling to Minimize Average Completion Time: Off-line and On-line Algorithms. SODA 1996: 142-151 | |
1995 | ||
4 | Leslie A. Hall: Approximability of Flow Shop Scheduling. FOCS 1995: 82-91 | |
1993 | ||
3 | EE | Leslie A. Hall: A Note on Generalizing the Maximum Lateness Criterion for Scheduling. Discrete Applied Mathematics 47(2): 129-137 (1993) |
1990 | ||
2 | Leslie A. Hall, David B. Shmoys: Near-Optimal Sequencing with Precedence Constraints. IPCO 1990: 249-260 | |
1989 | ||
1 | Leslie A. Hall, David B. Shmoys: Approximation Schemes for Constrained Scheduling Problems FOCS 1989: 134-139 |
1 | Michel X. Goemans | [6] |
2 | Luis Gouveia | [8] |
3 | David B. Shmoys | [1] [2] [5] |
4 | Joel Wein | [5] |