2003 | ||
---|---|---|
1 | EE | Germán Riaño, Richard F. Serfozo, Steven Hackman, Szu Hui Ng, Lai Peng Chan, Peter Lendermann: Simulation test bed for manufacturing analysis: benchmarking of a stochastic production planning model in a simulation testbed. Winter Simulation Conference 2003: 1183-1191 |
1 | Lai Peng Chan | [1] |
2 | Peter Lendermann | [1] |
3 | Szu Hui Ng | [1] |
4 | Germán Riaño | [1] |
5 | Richard F. Serfozo | [1] |