2008 |
6 | EE | Bernhard Fechner,
Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Fault-tolerant static scheduling for grids.
IPDPS 2008: 1-6 |
2006 |
5 | EE | Udo Hönig,
Wolfram Schiffmann:
Improving the Efficiency of Functional Parallelism by Means of Hyper-Scheduling.
ICPP Workshops 2006: 283-290 |
2005 |
4 | EE | Markus Bank,
Udo Hönig,
Wolfram Schiffmann:
An ACO-Based Approach for Scheduling Task Graphs with Communication Costs.
ICPP 2005: 623-629 |
2004 |
3 | | Udo Hönig,
Wolfram Schiffmann:
Fast Optimal Task Graph Scheduling by Means of an Optimized Parallel A*-Algorithm.
PDPTA 2004: 842-848 |
2 | EE | Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Internet-basierter Übungsbetrieb in Technischer Informatik (Web-Based Exercises in Computer Engineering).
it - Information Technology 46(5): 255-264 (2004) |
2003 |
1 | EE | Udo Hönig,
Wolfram Schiffmann:
A Parallel Branch-and-Bound Algorithm for Computing Optimal Task Graph Schedules.
GCC (2) 2003: 18-25 |