2009 |
7 | EE | Jorge José de Magalhães Mendes,
José Fernando Gonçalves,
Mauricio G. C. Resende:
A random key based genetic algorithm for the resource constrained project scheduling problem.
Computers & OR 36(1): 92-109 (2009) |
2008 |
6 | EE | José Fernando Gonçalves,
Jorge José de Magalhães Mendes,
Mauricio G. C. Resende:
A genetic algorithm for the resource constrained multi-project scheduling problem.
European Journal of Operational Research 189(3): 1171-1190 (2008) |
2007 |
5 | EE | José Fernando Gonçalves:
A hybrid genetic algorithm-heuristic for a two-dimensional orthogonal packing problem.
European Journal of Operational Research 183(3): 1212-1229 (2007) |
4 | EE | Dalila B. M. M. Fontes,
José Fernando Gonçalves:
Heuristic solutions for general concave minimum cost network flow problems.
Networks 50(1): 67-76 (2007) |
2006 |
3 | EE | Jorge M. S. Valente,
José Fernando Gonçalves,
Rui A. F. S. Alves:
A Hybrid Genetic Algorithm for the Early/tardy Scheduling Problem.
APJOR 23(3): 393-405 (2006) |
2005 |
2 | EE | José Fernando Gonçalves,
Jorge José de Magalhães Mendes,
Mauricio G. C. Resende:
A hybrid genetic algorithm for the job shop scheduling problem.
European Journal of Operational Research 167(1): 77-95 (2005) |
2002 |
1 | | José Fernando Gonçalves,
Jorge Raimundo de Almeida:
A Hybrid Genetic Algorithm for Assembly Line Balancing.
J. Heuristics 8(6): 629-642 (2002) |