2007 |
12 | EE | Guillermo Gallego,
José Ignacio Ronda,
Antonio Valdés,
Narciso García:
Recursive Camera Autocalibration with the Kalman Filter.
ICIP (5) 2007: 209-212 |
11 | EE | Guillermo Gallego,
Yue Jin,
Ana Muriel,
Ge Zhang,
V. Taylan Yildiz:
Optimal ordering policies with convertible lead times.
European Journal of Operational Research 176(2): 892-910 (2007) |
10 | EE | Guillermo Gallego,
Kaan Katircioglu,
Bala Ramachandran:
Inventory management under highly uncertain demand.
Oper. Res. Lett. 35(3): 281-289 (2007) |
2006 |
9 | EE | Guillermo Gallego,
Woonghee Tim Huh,
Wanmo Kang,
Robert Phillips:
Linear Convergence of Tatônnement in a Bertrand Oligopoly.
ICCSA (3) 2006: 822-831 |
8 | EE | Antonio Valdés,
José Ignacio Ronda,
Guillermo Gallego:
The Absolute Line Quadric and Camera Autocalibration.
International Journal of Computer Vision 66(3): 283-303 (2006) |
2005 |
7 | EE | José Ignacio Ronda,
Guillermo Gallego,
Antonio Valdés:
Camera autocalibration using Plucker coordinates.
ICIP (3) 2005: 800-803 |
6 | EE | Guillermo Gallego,
Özalp Özer:
A new algorithm and a new heuristic for serial supply systems.
Oper. Res. Lett. 33(4): 349-362 (2005) |
2004 |
5 | | Antonio Valdés,
José Ignacio Ronda,
Guillermo Gallego:
Linear camera autocalibration with varying parameters.
ICIP 2004: 3395-3398 |
4 | EE | Guillermo Gallego,
Haichao Hu:
Optimal Policies for Production/Inventory Systems with Finite Capacity and Markov-Modulated Demand and Supply Processes.
Annals OR 126(1-4): 21-41 (2004) |
2003 |
3 | EE | William Grey,
Kaan Katircioglu,
Sugato Bagchi,
Dailun Shi,
Guillermo Gallego,
Dave Seybold,
Stavros Stefanis:
An analytical approach for quantifying the value of e-business initiatives.
IBM Systems Journal 42(3): 484-497 (2003) |
2001 |
2 | EE | Tamer Boyaci,
Guillermo Gallego:
Minimizing holding and ordering costs subject to a bound on backorders is as easy as solving a single backorder cost model.
Oper. Res. Lett. 29(4): 187-192 (2001) |
1996 |
1 | EE | Guillermo Gallego,
Ilkyeong Moon:
How to avoid stockouts when producing several items on a single facility? What to do if you can't?
Computers & OR 23(1): 1-12 (1996) |