2005 | ||
---|---|---|
2 | EE | J. Yuan, W. P. Shang, Q. Feng: A note on the scheduling with two families of jobs. J. Scheduling 8(6): 537-542 (2005) |
2003 | ||
1 | Q. Feng, W. Hugh Woodin: P-points in Qmax models. Ann. Pure Appl. Logic 119(1-3): 121-190 (2003) |
1 | W. P. Shang | [2] |
2 | W. Hugh Woodin | [1] |
3 | J. Yuan | [2] |