2004 | ||
---|---|---|
3 | Emmanuelle Monsarrat, Cyril Briand, Patrick Esquirol: A decision support framework for cooperation in make-to-order production. COOP 2004: 69-82 | |
1997 | ||
2 | Patrick Esquirol, Pierre Lopez, Luc Haudot, Marc Sicard: Constraint-Oriented Cooperative Scheduling for Aircraft Manufacturing. IEEE Expert 12(1): 32-39 (1997) | |
1995 | ||
1 | Luc Haudot, Marc Sicard, Patrick Esquirol, Pierre Lopez: Approche par contraintes : application à un problème de gestion de production. JFPLC 1995: 329- |
1 | Cyril Briand | [3] |
2 | Luc Haudot | [1] [2] |
3 | Pierre Lopez | [1] [2] |
4 | Emmanuelle Monsarrat | [3] |
5 | Marc Sicard | [1] [2] |