2007 | ||
---|---|---|
10 | EE | Silvanus T. Enns: "Pull" replenishment performance as a function of demand rates and setup times under optimal settings. Winter Simulation Conference 2007: 1624-1632 |
2006 | ||
9 | EE | Silvanus T. Enns, Pattita Suwanruji: Observations on material flow in supply chains. Winter Simulation Conference 2006: 1446-1451 |
8 | EE | Silvanus T. Enns: The effects of backorder information and reduced-setup dispatching under reorder point or Kanban replenishment. Winter Simulation Conference 2006: 1914-1919 |
2005 | ||
7 | EE | Silvanus T. Enns, Pattita Suwanruji: Lot-sizing within capacity-constrained manufacturing systems using time-phased planning. Winter Simulation Conference 2005: 1433-1440 |
6 | EE | Silvanus T. Enns, Ping Zhu: Optimal lot-sizing in a two-stage system with auto-correlated arrivals. Winter Simulation Conference 2005: 1705-1711 |
5 | EE | Amir Messih, Silvanus T. Enns: Planning and control for a warranty service facility. Winter Simulation Conference 2005: 2102-2106 |
2004 | ||
4 | EE | Silvanus T. Enns, Li Li: Optimal Lot-Sizing with Capacity-Constraints and Auto-Correlated Interarrival Times. Winter Simulation Conference 2004: 1073-1078 |
3 | EE | Pattita Suwanruji, Silvanus T. Enns: Evaluating the Performance of Supply Chain Simulations with Tradeoffs Between Multiple Obljectives. Winter Simulation Conference 2004: 1399-1403 |
2003 | ||
2 | EE | Silvanus T. Enns, Pattita Suwanruji: Simulation test bed for manufacturing analysis: a simulation test bed for producton and supply chain modeling. Winter Simulation Conference 2003: 1174-1182 |
2002 | ||
1 | EE | Silvanus T. Enns, Sangjin Choi: Manufacturing modeling methods: USE of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems. Winter Simulation Conference 2002: 1123-1129 |
1 | Sangjin Choi | [1] |
2 | Li Li | [4] |
3 | Amir Messih | [5] |
4 | Pattita Suwanruji | [2] [3] [7] [9] |
5 | Ping Zhu | [6] |