![]() |
| 2006 | ||
|---|---|---|
| 2 | EE | Tianyang Dong, Ling Zhang, Ruofeng Tong, Jinxiang Dong: Synergic Production Process Controlling in Supply Chain Management. CSCWD 2006: 1285-1289 |
| 2005 | ||
| 1 | EE | Tianyang Dong, Ruofeng Tong, Ling Zhang, Jinxiang Dong: A collaborative approach to assembly sequence planning. Advanced Engineering Informatics 19(2): 155-168 (2005) |
| 1 | Jinxiang Dong | [1] [2] |
| 2 | Ruofeng Tong | [1] [2] |
| 3 | Ling Zhang | [1] [2] |