2009 |
11 | EE | Albert Corominas,
Rafael Pastor:
Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals.
European Journal of Operational Research 193(2): 639-643 (2009) |
2008 |
10 | EE | Albert Corominas,
Alberto García-Villoria,
Rafael Pastor:
Solving the Response Time Variability Problem by means of Multi-start and GRASP metaheuristics.
CCIA 2008: 128-137 |
2007 |
9 | EE | Albert Corominas,
Amaia Lusa,
Rafael Pastor:
Planning production and working time within an annualised hours scheme framework.
Annals OR 155(1): 5-23 (2007) |
8 | EE | Albert Corominas,
Amaia Lusa,
Rafael Pastor:
Planning annualised hours with a finite set of weekly working hours and cross-trained workers.
European Journal of Operational Research 176(1): 230-239 (2007) |
7 | EE | Albert Corominas,
Amaia Lusa,
Rafael Pastor:
Using a MILP model to establish a framework for an annualised hours agreement.
European Journal of Operational Research 177(3): 1495-1506 (2007) |
6 | EE | Albert Corominas,
Wieslaw Kubiak,
Natalia Moreno Palli:
Response time variability.
J. Scheduling 10(2): 97-110 (2007) |
2006 |
5 | | Alberto García,
Rafael Pastor,
Albert Corominas:
Solving the Response Time Variability Problem by means of metaheuristics.
CCIA 2006: 187-194 |
4 | EE | Natalia Moreno Palli,
Albert Corominas:
Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem.
Computers & OR 33: 928-939 (2006) |
2004 |
3 | EE | Albert Corominas,
Amaia Lusa,
Rafael Pastor:
Planning Annualised Hours with a Finite Set of Weekly Working Hours and Joint Holidays.
Annals OR 128(1-4): 217-233 (2004) |
2 | EE | Albert Corominas,
Amaia Lusa,
Rafael Pastor:
Characteristics and classification of the annualised working hours planning problems.
IJSTM 5(5/6): 435-447 (2004) |
2002 |
1 | EE | Albert Corominas:
A remark about "A comment on consecutive-2-out-of-n systems".
Oper. Res. Lett. 30(1): 69-70 (2002) |