2001 | ||
---|---|---|
1 | EE | Kim-Lin Chew, Johnny Pang, Qizhang Liu, Jihong Ou, Chung-Piaw Teo: An Optimization Based Approach to the Train Operator Scheduling Problem at Singapore MRT. Annals OR 108(1-4): 111-122 (2001) |
1 | Qizhang Liu | [1] |
2 | Jihong Ou | [1] |
3 | Johnny Pang | [1] |
4 | Chung-Piaw Teo | [1] |