2008 | ||
---|---|---|
3 | EE | Claver Diallo, Daoud Ait Kadi, Anis Chelbi: (s, Q) Spare Parts Provisioning Strategy for Periodically Replaced Systems. IEEE Transactions on Reliability 57(1): 134-139 (2008) |
2005 | ||
2 | EE | Nidhal Rezg, Anis Chelbi, Xiaolan Xie: Modeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit: analytical and simulation approaches. Int. J. Computer Integrated Manufacturing 18(2&3): 225-235 (2005) |
2004 | ||
1 | EE | Anis Chelbi, Daoud Ait Kadi: Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. European Journal of Operational Research 156(3): 712-718 (2004) |
1 | Claver Diallo | [3] |
2 | Daoud Ait Kadi | [1] [3] |
3 | Nidhal Rezg | [2] |
4 | Xiaolan Xie | [2] |