2004 | ||
---|---|---|
6 | EE | W. D. Tan, F. F. Gan, T. C. Chang: Using normal quantile plot to select an appropriate transformation to achieve normality. Computational Statistics & Data Analysis 45(3): 609-619 (2004) |
1997 | ||
5 | EE | G. Yut, T. C. Chang: Assessing the Feasibility of a Process Plan: A Study in Variable Interaction. Symposium on Solid Modeling and Applications 1997: 322-335 |
1992 | ||
4 | Satoru Hashiba, T. C. Chang: Heuristic and Simulated Annealing Approaches to PCB Assembly Setup Reduction. PROLAMAT 1992: 769-777 | |
1990 | ||
3 | EE | D. C. Anderson, T. C. Chang: Geometric reasoning in feature-based design and process planning. Computers & Graphics 14(2): 225-235 (1990) |
1988 | ||
2 | EE | Gad Eshel, Moshe M. Barash, T. C. Chang: 'Generate & test and rectify' - A plan synthesis tactic for automatic process planning. AI in Engineering 3(1): 18-31 (1988) |
1986 | ||
1 | EE | Sanjay Joshi, T. C. Chang, C. Richard Liu: Process planning formalization in an AI framework. AI in Engineering 1(1): 45-53 (1986) |
1 | D. C. Anderson | [3] |
2 | Moshe M. Barash | [2] |
3 | Gad Eshel | [2] |
4 | F. F. Gan | [6] |
5 | Satoru Hashiba | [4] |
6 | Sanjay Joshi | [1] |
7 | C. Richard Liu | [1] |
8 | W. D. Tan | [6] |
9 | G. Yut | [5] |