2008 |
7 | EE | Z. X. Guo,
W. K. Wong,
S. Y. S. Leung,
J. T. Fan,
S. F. Chan:
Genetic optimization of order scheduling with multiple uncertainties.
Expert Syst. Appl. 35(4): 1788-1801 (2008) |
6 | EE | Z. X. Guo,
W. K. Wong,
S. Y. S. Leung,
J. T. Fan,
S. F. Chan:
A Genetic-Algorithm-Based Optimization Model for Solving the Flexible Assembly Line Balancing Problem With Work Sharing and Workstation Revisiting.
IEEE Transactions on Systems, Man, and Cybernetics, Part C 38(2): 218-228 (2008) |
2007 |
5 | EE | A. H. Dong,
W. K. Wong,
S. F. Chan,
P. K. W. Yeung:
Developing an Apparel Supply Chain Simulation System with the Application of Fuzzy Logic.
Computational Textile 2007: 185-199 |
2006 |
4 | EE | Z. X. Guo,
W. K. Wong,
S. Y. S. Leung,
J. T. Fan,
S. F. Chan:
A Bi-level Genetic Algorithm for Multi-objective Scheduling of Multi- and Mixed-Model Apparel Assembly Lines.
Australian Conference on Artificial Intelligence 2006: 934-941 |
3 | | B. L. Song,
W. K. Wong,
J. Fan,
S. F. Chan:
An Adjusted Recursive Operator Allocation Optimization Algorithm for Line Balancing Control.
IMECS 2006: 802-807 |
2002 |
2 | EE | W. H. Ip,
K. Y. Chau,
S. F. Chan:
Implementing ERP through continuous improvement.
IJMTM 4(6): 465-478 (2002) |
1994 |
1 | EE | G. J. Lu,
H. K. Pung,
T. S. Chua,
S. F. Chan:
Temporal synchronization support for distributed multimedia information systems.
Computer Communications 17(12): 852-862 (1994) |