![]() |
| 2001 | ||
|---|---|---|
| 2 | Cristina C. B. Cavalcante, C. Carvalho de Souza, Martin W. P. Savelsbergh, Y. Wang, Laurence A. Wolsey: Scheduling projects with labor constraints. Discrete Applied Mathematics 112(1-3): 27-52 (2001) | |
| 2000 | ||
| 1 | Susanne Heipcke, Yves Colombani, Cristina C. B. Cavalcante, Cid C. de Souza: Scheduling under Labour Resource Constraints. Constraints 5(4): 415-422 (2000) | |
| 1 | Yves Colombani | [1] |
| 2 | Susanne Heipcke | [1] |
| 3 | Martin W. P. Savelsbergh | [2] |
| 4 | C. Carvalho de Souza | [2] |
| 5 | Cid C. de Souza | [1] |
| 6 | Y. Wang | [2] |
| 7 | Laurence A. Wolsey | [2] |