![]() |
| 2008 | ||
|---|---|---|
| 3 | EE | Wanan Cui, Shengbao Yao, Xiuning Cao: Critical Sequence Optimization under Adjustable Resource-Constrained Project Scheduling. CSSE (5) 2008: 1000-1003 |
| 2 | EE | Wanan Cui, Zhenqian Wang, Xiuning Cao: Links Optimization for Resource-Constrained Project Scheduling. CSSE (5) 2008: 980-983 |
| 1 | EE | Wanan Cui, Shengbao Yao, Xiuning Cao: Links Analysis in Resource Constrained Projects. CSSE (5) 2008: 988-991 |
| 1 | Wanan Cui | [1] [2] [3] |
| 2 | Zhenqian Wang | [2] |
| 3 | Shengbao Yao | [1] [3] |