![]() | ![]() |
2005 | ||
---|---|---|
2 | EE | Ahmet Bolat, Ibrahim Al-Harkan, Bandar Al-Harbi: Flow-shop scheduling for three serial stations with the last two duplicate. Computers & OR 32: 647-667 (2005) |
1994 | ||
1 | EE | Ahmet Bolat, Mehmet Savsar, Mohammed A. Al-Fawzan: Algorithms for real-time scheduling of jobs on mixed model assembly lines. Computers & OR 21(5): 487-498 (1994) |
1 | Mohammed A. Al-Fawzan | [1] |
2 | Bandar Al-Harbi | [2] |
3 | Ibrahim Al-Harkan | [2] |
4 | Mehmet Savsar | [1] |