2009 | ||
---|---|---|
6 | EE | Özgür Yalçinkaya, Gunhan Mirac Bayhan: Modelling and optimization of average travel time for a metro line by simulation and response surface methodology. European Journal of Operational Research 196(1): 225-233 (2009) |
2006 | ||
5 | EE | Derya Eren Akyol, Gunhan Mirac Bayhan: Minimizing Makespan on Identical Parallel Machines Using Neural Networks. ICONIP (3) 2006: 553-562 |
4 | EE | Pinar Mizrak, Gunhan Mirac Bayhan: Comparative Study of Dispatching Rules in a Real-life Job Shop Environment. Applied Artificial Intelligence 20(7): 585-607 (2006) |
2005 | ||
3 | EE | Derya Eren Akyol, Gunhan Mirac Bayhan: A Coupled Gradient Network Approach for the Multi Machine Earliness and Tardiness Scheduling Problem. ICCSA (4) 2005: 596-605 |
2 | EE | Gonca Tuncel, Gunhan Mirac Bayhan: A High-Level Petri Net Based Decision Support System for Real-Time Scheduling and Control of Flexible Manufacturing Systems: An Object-Oriented Approach. International Conference on Computational Science (1) 2005: 843-851 |
1 | EE | Gonca Tuncel, Derya Eren Akyol, Gunhan Mirac Bayhan, Utku Koker: Application of Activity-Based Costing in a Manufacturing Company: A Comparison with Traditional Costing. International Conference on Computational Science (3) 2005: 562-569 |
1 | Derya Eren Akyol | [1] [3] [5] |
2 | Utku Koker | [1] |
3 | Pinar Mizrak | [4] |
4 | Gonca Tuncel | [1] [2] |
5 | Özgür Yalçinkaya | [6] |