2009 | ||
---|---|---|
5 | EE | Jiaqiong Chen, Ronald G. Askin: Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research 193(1): 23-34 (2009) |
2006 | ||
4 | EE | Ronald G. Askin, Jiaqiong Chen: Dynamic task assignment for throughput maximization with worksharing. European Journal of Operational Research 168(3): 853-869 (2006) |
2004 | ||
3 | EE | Mary E. Kurz, Ronald G. Askin: Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159(1): 66-82 (2004) |
2 | EE | Wei Huang, Ronald G. Askin: A generalized SSI reliability model considering stochastic loading and strength aging degradation. IEEE Transactions on Reliability 53(1): 77-82 (2004) |
1991 | ||
1 | EE | Kah Mun Cheh, Jeffrey B. Goldberg, Ronald G. Askin: A note on the effect of neighborhood structure in simulated annealing. Computers & OR 18(6): 537-547 (1991) |
1 | Kah Mun Cheh | [1] |
2 | Jiaqiong Chen | [4] [5] |
3 | Jeffrey B. Goldberg | [1] |
4 | Wei Huang | [2] |
5 | Mary E. Kurz | [3] |