![]() | ![]() |
2007 | ||
---|---|---|
4 | EE | Özlem Uzun Araz: Real-Time Controlled Multi-objective Scheduling Through ANNs and Fuzzy Inference Systems: The Case of DRC Manufacturing. International Conference on Computational Science (4) 2007: 973-976 |
3 | EE | Derya Eren Akyol, Özlem Uzun Araz: A Neural Network Based Decision Support System for Real-Time Scheduling of Flexible Manufacturing Systems. OR 2007: 83-88 |
2006 | ||
2 | EE | Özlem Uzun Araz, Özgür Eski, Ceyhun Araz: A Multi-Criteria Decision Making Procedure Based on Neural Networks for Kanban Allocation. ISNN (2) 2006: 898-905 |
2005 | ||
1 | EE | Özlem Uzun Araz: A Simulation Based Multi-criteria Scheduling Approach of Dual-Resource Constrained Manufacturing Systems with Neural Networks. Australian Conference on Artificial Intelligence 2005: 1047-1052 |
1 | Derya Eren Akyol | [3] |
2 | Ceyhun Araz | [2] |
3 | Özgür Eski | [2] |