| 2008 | 
|---|
| 9 | EE | Bruce E. Ankenman,
Barry L. Nelson,
Jeremy Staum:
Stochastic kriging for simulation metamodeling.
Winter Simulation Conference 2008: 362-370 | 
| 8 | EE | Mustafa Tongarlak,
Bruce E. Ankenman,
Barry L. Nelson,
Laurent Borne,
Kyle Wolfe:
Using simulation early in the design of a fuel injector production line.
Winter Simulation Conference 2008: 471-478 | 
| 7 | EE | Feng Yang,
Bruce E. Ankenman,
Barry L. Nelson:
Estimating Cycle Time Percentile Curves for Manufacturing Systems via Simulation.
INFORMS Journal on Computing 20(4): 628-643 (2008) | 
| 2007 | 
|---|
| 6 | EE | Feng Yang,
Jingang Liu,
Mustafa Tongarlak,
Bruce E. Ankenman,
Barry L. Nelson:
Metamodeling for cycle time-throughput-product mix surfaces using progressive model fitting.
Winter Simulation Conference 2007: 322-330 | 
| 2006 | 
|---|
| 5 | EE | Bruce E. Ankenman,
Russell C. H. Cheng,
Susan M. Lewis:
A polytope method for estimating factor main effects efficiently.
Winter Simulation Conference 2006: 369-375 | 
| 2005 | 
|---|
| 4 | EE | Feng Yang,
Bruce E. Ankenman,
Barry L. Nelson:
Efficient generation of cycle time-throughput curves through simulation and metamodeling.
Winter Simulation Conference 2005: 1 | 
| 3 | EE | Feng Yang,
Bruce E. Ankenman,
Barry L. Nelson:
Estimation of percentiles of cycle time in manufacturing simulation.
Winter Simulation Conference 2005: 475-484 | 
| 2004 | 
|---|
| 2 | EE | Rachel T. Johnson,
Feng Yang,
Bruce E. Ankenman,
Barry L. Nelson:
Nonlinear Regression Fits for Simulated Cycle Time vs. Throughput Curves for Semicondutor Manufacturing.
Winter Simulation Conference 2004: 1951- | 
| 2003 | 
|---|
| 1 | EE | Wan Hong,
Bruce E. Ankenman,
Barry L. Nelson:
Issues on simulation and optimization I: controlled sequential bifurcation: a new factor-screening method for discrete-event simulation.
Winter Simulation Conference 2003: 565-573 |