![]() | ![]() |
2006 | ||
---|---|---|
2 | EE | K. P. Anagnostopoulos, A. P. Vavatsikos: An AHP model for construction contractor prequalification. Operational Research 6(3): 333-346 (2006) |
2001 | ||
1 | EE | K. P. Anagnostopoulos, L. Kotsikas: Time-cost trade off in cpm networks by simulated annealing. Operational Research 1(3): 315-329 (2001) |
1 | L. Kotsikas | [1] |
2 | A. P. Vavatsikos | [2] |