![]() |
| 2004 | ||
|---|---|---|
| 5 | EE | Ali Allahverdi, Tariq A. Aldowaisan: No-wait flowshops with bicriteria of makespan and maximum lateness. European Journal of Operational Research 152(1): 132-147 (2004) |
| 2003 | ||
| 4 | EE | Tariq A. Aldowaisan, Ali Allahverdi: New heuristics for no-wait flowshops to minimize makespan. Computers & OR 30(8): 1219-1231 (2003) |
| 2001 | ||
| 3 | EE | Tariq A. Aldowaisan: A new heuristic and dominance relations for no-wait flowshops with setups. Computers & OR 28(6): 563-584 (2001) |
| 1998 | ||
| 2 | EE | Tariq A. Aldowaisan, Ali Allahverdi: Total flowtime in no-wait flowshops with separated setup times. Computers & OR 25(9): 757-765 (1998) |
| 1994 | ||
| 1 | EE | Lotfi K. Gaafar, Tariq A. Aldowaisan: Fitting a mixture-based response surface using computer simulation. Winter Simulation Conference 1994: 1424-1427 |
| 1 | Ali Allahverdi | [2] [4] [5] |
| 2 | Lotfi K. Gaafar | [1] |